The year of the winged banana…
Starting to glue the ribs. (Well, I have composite spar tips) |
|
Roughly shaped ribs cemented with slurry |
|
Assembling the leading edge |
|
The elevator! |
|
Tank checked for leaks with shaving foam and compressed air. |
|
Tank glassed to the spars with 3 BID (300 gr/m2) |
|
One of the few departures from the plans: aluminum wing tanks. (Well, if I had to do it again, perhaps I'll chose composite tanks in the stub wings) |
|
Right outer wing being foamed. |
|
The horizontal stabilizer, ready for glassing, enjoys a sunny afternoon. |
|
Seat back supports epoxied. |
|
Seat back: here too I epoxied two 3/32" plywood sheets, as I couldn't bend the ¼" ply into its position. |
|
Footstep: strong (but not light!), it will be covered by 2,5 mm plywod. |
|
|
|